One rack, with 4 UPS mounted at the top.
the Myrinet switch. A very expensive box.
The network rack from the front: we put the Myrinet switch
in facing backwards. One UPS is mounted at the bottom.
Close-up of the 4 top-mounted UPS, with Don Moore.
The master node. Rails are mounted for 2 slave nodes.
Don Moore and a node-free rack.
Steve with the racks.
Steve hard at work.
Steve with the Myrinet switch and the master node.
All the racks. The one to the right is also ours.
The UPS loaded racks.
rail-mounted nodes, waiting to be mounted.
nodes starting to fill in.
rails.
partially empty rack.
mounting the nodes.
mounting the nodes.
mounting the nodes.
mounting the nodes.
mounting the rails.
mounting the rails.
mounting the rails.
Steve and Chi-Cheng putting the rails on.
Don checking each machine.
Steve putting the rails on.
Chi-Cheng putting the rails on.
Steve and Don checking the machines.
complete rack from the front.
complete rack from the back.
back of racks.
close-up of back: power cables on left, ethernet cables in the middle,
myrinet cables on right.
racks from the front.
cables through the top of a rack.
cables through the top of a rack.
myrinet cables coiled just below ceiling.
the myrinet switch.
the myrinet switch monitor: green is what we're looking for.
the network rack.
Don hot-swapping a hard drive.
hot-swappable hard drives punch out the front.
looking up.
looking down.
Don repairing a node.
Don repairing a node.