![]() | One rack, with 4 UPS mounted at the top. |
| the Myrinet switch. A very expensive box. | ![]() |
![]() | The network rack from the front: we put the Myrinet switch in facing backwards. One UPS is mounted at the bottom. |
| Close-up of the 4 top-mounted UPS, with Don Moore. | ![]() |
![]() | The master node. Rails are mounted for 2 slave nodes. |
| Don Moore and a node-free rack. | ![]() |
![]() | Steve with the racks. |
| Steve hard at work. | ![]() |
![]() | Steve with the Myrinet switch and the master node. |
| All the racks. The one to the right is also ours. | ![]() |
![]() | The UPS loaded racks. |
| rail-mounted nodes, waiting to be mounted. | ![]() |
![]() | nodes starting to fill in. |
| rails. | ![]() |
![]() | partially empty rack. |
| mounting the nodes. | ![]() |
![]() | mounting the nodes. |
| mounting the nodes. | ![]() |
![]() | mounting the nodes. |
| mounting the rails. | ![]() |
![]() | mounting the rails. |
| mounting the rails. | ![]() |
![]() | Steve and Chi-Cheng putting the rails on. |
| Don checking each machine. | ![]() |
![]() | Steve putting the rails on. |
| Chi-Cheng putting the rails on. | ![]() |
![]() | Steve and Don checking the machines. |
| complete rack from the front. | ![]() |
![]() | complete rack from the back. |
| back of racks. | ![]() |
![]() | close-up of back: power cables on left, ethernet cables in the middle, myrinet cables on right. |
| racks from the front. | ![]() |
![]() | cables through the top of a rack. |
| cables through the top of a rack. | ![]() |
![]() | myrinet cables coiled just below ceiling. |
| the myrinet switch. | ![]() |
![]() | the myrinet switch monitor: green is what we're looking for. |
| the network rack. | ![]() |
![]() | Don hot-swapping a hard drive. |
| hot-swappable hard drives punch out the front. | ![]() |
![]() | looking up. |
| looking down. | ![]() |
![]() | Don repairing a node. |
| Don repairing a node. | ![]() |